Friday, March 21, 2008
today is juz a blog day...
had juz blog @ *My Starrylicious*
of cos not with moi painted nails....
heh...
wil kena scold if i paint moi nails
=P
anw,
i wana do wif the reno 终结篇
the laz post on reno
din reali end well previously...
now gona show watz behind the glass planels:

lurve the showering head.
now bathing inside is a comfort...
actuali we can use our toilet
maybe 2daz later after i had blogged abt it.
am juz lazy to do a write up on it.
heh...
previous post on reno @ *HERE*
Labels: reno stuffs
♥ a butterfly landed @
10:52 AM
Tuesday, February 26, 2008
here am i reporting on the reno stuffs again
after so mani daz of work
it had sorta completed on the day we went back sg
which is 27thJan
we oni get to see/chk when
we juz came back on 23rdFeb
n we moved in to use
our 'new' room:
muahaahaa
so paisay of the untidyness
cos everything stil not back to the normal
quite afew commented tat our room got a romantic feel
hehheh...
the wallpaper
=D
love the color
silver/blue/grey
hah...
the toilet:
moi ahlim had put in alot
of efford on 'designing' this toilet
esp this:
the glass planels
for showering
*thumbs up* for moi ahlim
then the basin cum cupboard:
black & white
decided by moi ahlim
wondering why i no put up moi FIL room
becos there was leakage in his toilet!
aiya...
til now the plumber haven solved it
reali so heart ache tat
everything so nicely done
n goto removed it n re-do again
xianz~~~
n becos of the leakage
we cant use our toilet as well
both of our toilet shared the
same 'water switch'
had to stop water coming into FIL toilet for now
so had to turn off water supply to his toilet
n tat means our toilet oso no have water supply
=S
the leakage was so serious
tat it had caused moi office ceiling a crack dripping water
moi office was underneath FIL room
so the water sorta accumulated in moi fake ceiling
n then when the fake ceiling couldnt hold any longer
itz gave a crack for the water to drip out.
aiya
hoping the plumber faster solve the prob
so we can use our toilets...
previous post on reno @ *HERE*
Labels: reno stuffs
♥ a butterfly landed @
11:11 AM
Sunday, January 27, 2008
yesterday was a busy afternoon
for the reno thingy
they came 1 after another
=/
all came crushing togather
to do laz min work
1st came the wallpaper pax
@ ard 3pm+ to 4pm
n while they r stil doing
there came the heater pax
to install our rooms heater
@ ard 6pm+
ok... by 7pm+ or 8pm+
left the wallpaper pax n heater pax
and!!! the wallpaper stil short of 2 rolls
=S
somemore we had the shop pax
to come to our room n calculate
=/
@ 8pm came the glass panels
(laz batch liao)
finali the glass panels r up!
now doing the toiletries
n stil left the curtains
oh forget to mention tat the
furnitures came on thu(24th)
n they gave our tv console
to other ppl
n we goto wait til april bah...
*angry*
how can they do biz like tat
previous post on reno @ *HERE*
Labels: reno stuffs
♥ a butterfly landed @
9:22 AM
Thursday, January 24, 2008
oh my! oh my!
the painters work reali CMI
patches everywhere
=S
spoilt a newly renovated room
can we deduct their $$$
cos me & ahlim decided to stick up wallpaper
kinda waste the $ huh
but their work reali su*cks!
n we goto use our pocket $ to do the wallpaper
n the glass panels
say need abt 14daz to reach
but till now stil not here
n dun even bother to gif us a call
to inform us....
*angry*
n now they stil cant gif us an exact date when
it wil arrive.
n cos of the glasses not up yet
we cant install the toiletries
delay delay delay
i sort of tink tat is their excuse
maybe the shop dun haf enuff workers
to do up for us
so gif us an excuse tat the glasses not here yet.
reali hate their working attitude here.
things done:
- chosen curtains yesterday wil do it nxt week
- wallpaper chosen wil do up on sat
(manage to ask them stick up for us b4 we left)
- shower heater shd be done by today
- furnitures r here, stil fixing up
previous post on reno @ *HERE*
Labels: reno stuffs
♥ a butterfly landed @
3:21 PM
Friday, January 18, 2008
ahh!!!
tat painting works can oni finished
by 22ndFeb
reali hates their working process
SLOW SLOW SLOW
til now they haven start painting on the walls
juz finished painting on the doors
everything got to push back
everything arent on schdule
cos of tat painters
hopefully
they can finished by 22thFeb
or even earlier
n the rest of the arragements go
according to our plans w/o hipcups
planning for now is:
- 22ndFeb nite do cleaning
- 23rdFeb install shower heater (morning)
- 23rdFeb fixed up showering glass panels (noon)
- 24thFeb fixed up toilteries n furnitures delivery
previous post on reno @ *HERE*
Labels: reno stuffs
♥ a butterfly landed @
4:28 PM
Tuesday, January 15, 2008
this post is to show the pix of
our new kitchen
=)
itz sort of ready to be use
but stil short of the
basin n gas not yet installed
n the upper cupboard doors not ready too
anw, yesterday me n jo cleaned up
the drawers n cupboards
to put in our electric stuffs
=D
~the kitchen~
frm the entrance view:
not a veri big kitchen
not a veri small kitchen
itz a cosy kitchen
hah...
the other side opp of the stove:
this is to put/keep our
electric stuffs
the basin side:
the metal stuff below is a
disinfection 'oven' aka 消毒柜
is to disinfection all the dishes after wash.
the stove side:
most of the stuffs inside
r choosen by me n ahlim
oni the walls n floor tiles r choosen by moi FIL.
likey our cabinet colors
reali goes so well with the tiles.
^_^
we had a new kitchen
oso means we had a new dinning room
=)
both dinning room n kitchen were linked
meas tat oni got 1 entrance door.
~the dinning room~
frm the entrance view:
the table we r using now
is an old one
did buy a new piece
wil deliver togather wif our room furnitures.
frm the kitchen view:
now temp this is our
dinning cum living room
spending our leisure time in ter too
once living room aka old conference room is ready
(PS: stil doin painting works, start reno wif our rooms)
tat wil be our living room
=)
the view to show kitchen n dinning room r linked:
stil abit tad messy
but we r shifting bits by bits
of the stuffs to our new kitchen
=D
if u wan to look @ all reno posts
u can either click on the link *HERE*
or click on the Labels: reno stuffs
to see all reno posts.
*HERE*
Labels: reno stuffs
♥ a butterfly landed @
11:05 AM
remembered i did mention on
the problems we met,
gg to show pix of tat
1. the piping head for the showering
we find it kinda too high
to install the showering stand
anw, luckily we did find a shorter showering stand liao.
2. the 地漏
FIL toilet:
me n ahlim toilet:
kinda sad to see the cracks
itz all becos of tat shop
sells us the drainage cover tat wil turn rusty
*arrrrgh*
n now hopefully the painters wil finished their work in time
their movements is so slow lor
somemore yesterday din come
now stil haven start on the walls
=/
previous post on reno @ *HERE*
Labels: reno stuffs
♥ a butterfly landed @
10:48 AM
Saturday, January 12, 2008
hmm...
yesterday came to 'install' the kitchen cabinet/cupboard
yeah! we got a new kitchen liao
wil post up pix after done
they stil doin today.
the painters finali came today
painting the doors 1st
then the walls
hope they can faster finished
so we can clean b4 the new furnitures came on 20th
anw we may wan the furnitures to send on 22nd bah.
decided not to knock off the toilet wall tiles
remain as it is
cos had found a shorter showering stand
but...
cos of the 地漏
(hmm... forgot watz 地漏 in eng)
had became rusty b4 we used the toilet
had to knock it out n changed a better one
n the knocking off of it had caused some cracks on the floor tiles ard it
*super sad*
@ 1st the tiles were veri nice
but now got some cracks liao.
=S X 10
things done:
- chosen toiletries, wil come n install on 22th/23rd/24th
*praying to god*
oh pls...
hope there arent any new prob comin up
previous post on reno @ *HERE*
Labels: reno stuffs
♥ a butterfly landed @
11:47 AM
Wednesday, January 9, 2008
头大了!
真是头大了!
yesterday we found out something
had done wrongly in the bathroom
n goto re-do......
*sianzzz*
the piping 'head' for the showering
was kinda too high =S
goto to knock off some of tiles
n extend the pipes
n make the 'head' @ a lower position.
but
we r afraid tat when knocking off
the affected tiles will affect the rest of the tiles.
now we can oni pray hard tat nothing goes wrong frm tat decision.
anw,
the carpenter stil haven finished his work.
stil working on the doors n doors frame.
guess the painting wil start tml or nxt nxt day.
am so so afraid of the painting.
cos here,
they need to scrap off the old painting
(tat wil cos the whole place super dusty)
then put on the new painting.
~pix of our lighting~
moi+ahlim room:
the light above our bed:
closer look:
i chose this light
cos i find it got a zen feel.
heh.
moi FIL room:
the abv bed light:
this is not the initial design i chose.
the one i chose was OOS
then they juz brought a sub
moi FIL quite like this one thu.
~the toilets~
(both toilets r of the same)
why need 2 types of lighting?
the white one is a normal lighting
the orangey one when on wil heat up the bathing area,
so itz good to use in cold daz.
closer look of the tiles under white light:
n under orangey light:
overview:
notice tat ters a white 'divider'?
the small part to the wall wil be the showering area
then ter wil be glass panels on tat white divider
to become a close up area.
1 glass panel wil be fixed,
another glass panel wil be a sliding one.
hehheh... all these r 'design' by moi ahlim
^_^
things done:
- chosen the glass panels (ohmy, itz need abt 15daz to deliver)
previous post on reno @ *HERE*
Labels: reno stuffs
♥ a butterfly landed @
10:51 AM
Monday, January 7, 2008
wana do some updates on the reno
hmm... the carpenter did came on 4thjan
n was told tat by today they can finish their work
*suprised*
actuali now they oni left the 'doors' to complete
the furnitures of the 2 rooms
had chosen on laz sat(5thjan)
BUT
ahlim n i was kinda sad/disappointed
cos we din get the type of wardrobe tat we wan
so goto use back the old one 1st...
things done:
- false ceiling up
- lightings (toilets & rooms) were up
- doors done halfway
- furniture chosen, to be delivered on 20thjan
previous post on reno @ *HERE*
Labels: reno stuffs
♥ a butterfly landed @
3:02 PM
Thursday, January 3, 2008
the reno had stopped for 2 days liao
cos the carpenter said he was busy on 1st n 2nd Jan
wil oni come n start on 3rd Jan
which is today but he/they wasnt here yet.
oh... doesnt he knw tat we r waiting for him to start work.
if he delay his work,
others stuffs after his wil be delayed too.
stuffs he gona do r
making the doors of our rooms
doors of the toilets rooms
n fixed up the false ceiling
in the mean while,
our electrician man goto lay the
lighting electric b4 the ceiling was up.
previous post on reno @ *HERE*
Labels: reno stuffs
♥ a butterfly landed @
10:00 AM
Monday, December 31, 2007
had took some pix of our rooms juz now
now, all the tiles r up
n fake ceiling had removed this morning
PS: i tink the pix arent taken tat good
cos my hands r frezzing hard tat time
heehee...
moi+ahlim room:

moi+ahlim toilet:

everybody (me, ahlim & the contractor) finds tat the toilet is veri nice.
the light pinkish walls wif seashell 'lining'
moi FIL room:
both of the rooms r 'design' to be the same.
then everything we chose r the same too.
but, ter is 1 little different.
not gona said it here.... =X
the toilet:


i wana say:
~a BIG THANKS to ahlim~
in this 2 bedroom reno
he had put in alot of effort
tiny little things he oso take into consideration
n tat time he goto handle both his work
n this reno stuffs
~applause to moi ahlim~
things done:
- windows r up
- fake ceiling chosen
- door knob chosen
- moved to new kitchen cum dinning area for meals
- lightings goto be chosen later today
previous post on reno @ *HERE*
Labels: reno stuffs
♥ a butterfly landed @
3:17 PM
Wednesday, December 26, 2007
dressed up moi nails for this xmaz
^_^
for more can go to
*My Starrylicious*
these few daz
i seemed to be busy but not so busy
itz all cos of the reno work here
i need to go choose some stuff wif ahlim
see or look after wat/where the construction workers had done to
did they do wrongly?
we r worried tat the showering part din do as we wan them to be
we r worried tat they din stick the tiles nicely
n later on the tiles wil 'pop' up
since we r renovating goto do wat we expect mah...
we too, r sort of worried on their progess n 'skills'
i guess they did haf skills but scared tat they anyhow do
cos they stil got other projects on hand so wil rush out our reno
i owayz tried not to worry so much
but how to...
here is so dif frm sg...
things done:
-toilets water piping laid, cement covered
-toilets walls tiles r sticked up
-portions of bedroom floor r sticked up
previous post on reno @ *HERE*
Labels: nails stuffs, reno stuffs
♥ a butterfly landed @
11:06 AM
Wednesday, December 19, 2007
our rooms here doin some reno
reno started yesterday (18.12.2007)
reno stil in progress now (knocking off the old tiles)
=S
so noisy & so dirty
=P
i told moi ahlim
this is the time for us to 'train'
@ least when we get our new flat we knw abitbit liao
things done:
-tiles chosen
-half confirm on the showering part
Labels: reno stuffs
♥ a butterfly landed @
10:29 AM